Took a walk around LLeras and Calle 10 about 7 PM on Saturday and again on Sunday around 8 AM. Interesting in the evening as the street along side Gusto's side of the park is being re-done so it's only a narrow walkway. In most places, there's not enough area for SW's to hang as they would basically be blocking the walkway in many areas. So after walking alongside that side of the park I went to Calle 10 and started walking up towards Provenza and there was a line up of girls and seemed like quite a few and some pretty ones, along with some very aggressive ones, or perhaps I should say very hungry ones as one was after me, LOL.
Anyways, some parts of the Park seem almost complete, but at the bottom of the park they still have a large subsurface drainage basin to install which involves a lot of concrete work so it's going to take a awhile.
And on Sunday morning I went by and there were construction crews working on a Sunday. So who knows how things will transform when the park re-opens. I'm wondering that if besides the SW's in the Park there will also be all the SW's up Calle 10 and on the side streets. Who knows as it's interesting how things evolve and change here.
